Don Bartletti / Los Angeles Times Pipes are installed to carry water from the Poseidon Water desalination plant in Carlsbad, which is scheduled to open in November. Pipes are installed to carry water from the Poseidon Water desalination plant in Carlsbad, which is scheduled to open in November.
http://www.latimes.com/local/orangecounty/la-me-huntington-beach-desal-20150517-story.html#navtype=outfit